Case Study: Collaboration with Siemens produces replacement controls
Share
The Marquette Board of Light and Power is a municipal electric utility serving approximately 17,000 customers in the city of Marquette nine townships in Marquette County, Michigan.
They commissioned a replacement control system and burner management system for their 50mw plant. Trident collaborated with our partner, Siemens, to design a control system for the plant, but our team members were on start for installation and start-up. During start-up, we were called on to trouble-shoot and adjust the system to maximize operation.
Posted in Case Study, General | Tagged in Marquette Board of Light and Power, Burner Management System, Control System, Siemens, Trident Automation
Leave a Reply