Case Study: Paper machine up and running in three weeks

Georgia Pacific needed a new control system on one of their most important paper machines that was damaged and out of production, but had pending orders. Damage was too extensive for repairs and the system had to be replaced. Normally a tight replacement schedule would have taken several weeks or months, but all three of Trident’s principal owners worked around the clock to design, engineer, configure and install a new, customized control system in only three weeks. Trident was on […] Read More

Case Study: New system in and running in four hours

Louis Dreyfus Commodities operates an ethanol plant in Norfolk, Nebraska. The plant needed a new operating system, but could not afford to lose any production time. Trident worked with plant managers to design a system and process that could be installed during a scheduled 3-day outage. For 12 weeks, teams did pre-engineering work in Wisconsin with installation designed to take hours instead of days. On site, engineers removed an APACS DCS, then installed a customized cabling system to use existing […] Read More