Georgia Pacific needed a new control system on one of their most important paper machines that was damaged and out of production, but had pending orders.
Damage was too extensive for repairs and the system had to be replaced. Normally a tight replacement schedule would have taken several weeks or months, but all three of Trident’s principal owners worked around the clock to design, engineer, configure and install a new, customized control system in only three weeks. Trident was on site for the start up and the machine was back in production.

Leave a Reply

Your email address will not be published. Required fields are marked *